Central Utility Plant Replacement (CUPR) P3
Deliverables
Delivering large-scale energy projects under a P3 contract
OCMI is working closely with CSU Fresno on their first Private-Public Partnership (P3): Design-Build-Finance-Maintain (DBFM) energy contract, with a total capital construction cost of $130 million. This is a 33-year public-private partnership for the developer, Bulldog Infrastructure Group, to modernize and maintain Fresno State’s central utility infrastructure system.
The scope of the project includes the comprehensive replacement of the central plant (generation of cooling/heating), distribution piping (HHW/CHW), and a campus-wide EMS/BMS system. Also included are Energy Conservation Measures (ECM) in campus buildings and Solar PV generation (~4.8mw) on surface parking lots P20 & P27.
This multi-year project will result in a long-term, sustainable infrastructure for the campus and energy savings goal of more than 30%. OCMI is providing project and construction management in an Owner’s Representative role.