Ticketing Hall Expansion

Client
Reno-Tahoe Airport Authority
Deliverables

Terminal Development, Ticketing Hall Expansion Design Services

Renovated in 2010, the two-story ticketing hall at RNO includes the RTAA administrative offices on the second floor. The first floor is separated into five distinct areas, only three of which were expanded, including the passenger hallways for circulation, passenger seating areas, and exterior canopied curbside areas. After a detailed study of the space, the areas were updated for their structural systems and utilities, which included building system upgrades such as HVAC infrastructure and surface and subsurface improvements. OCMI provided cost estimating services at BOD and final study levels for building, roof replacement, and AHU systems, as well as alternatives for finish upgrades and a skybridge HVAC unit.