Higher Ed
K - 12
Civic
Infrastructure
Hospitality
Healthcare
History
Culture
Leadership
The scope of this assignment included a 45,000 SF administration building and a 30,000 SF operations building. Both are LEED Silver. The buildings support the efforts of the Pier G mega-terminal. This was just one assignment under our 3-year, on-call contract with the Port of Long Beach. The contract was re-competed in 2011, and was awarded to us for the second time.
main project image
Projects
Images 1  2  3  4  5  6